Fort Dodge MBW Plumbing and HVAC Changes
Agency: | State of Iowa - Department of Transportation |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD18080794804340378 |
Posted Date: | Oct 3, 2023 |
Due Date: | |
Solicitation No: | RFB FY2024 #170 |
Bid Information
Type | Request for Bid - Informal - Construction |
Status | Awarded |
Number | RFB FY2024 #170 (Fort Dodge MBW Plumbing and HVAC Changes) |
Issue Date & Time | 8/31/2023 01:00:02 PM (CT) |
Close Date & Time | 9/13/2023 01:00:00 PM (CT) |
Duration | 12 days 23 hours 59 minutes 57 seconds |
Notes |
We highly recommend online submission of responses. This expedites the process and reduces errors for both buyer and supplier.
If you are not yet a registered supplier in ION Wave, please click this link https://iowadotebid.ionwave.net/Login.aspx to register for participation and full access to all documents.
Overview:
The Iowa Department of Transportation is seeking bids for Plumbing & HVAC Changes at the Fort Dodge, IA Mechanical Brine Wash Bay
located at 2088 230th Street, Fort Dodge, IA 50501
Award: It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: Meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.
Questions: All questions related to this project are to be submitted through the ION Wave Bid system on or before the cut off date and time as indicated in the solicitation.
Start date - Coordinated upon award of contract.
Project end date- 12/31/2023 (This includes re solution to all punch list items, inspections and DOT acceptance typically used in construction bids).
C ontractor is required to provide all materials, equipment and labor for the removal and replacement of material as per plans/specifications outlined on the Line Item tab. This includes the disposal of all debris off site.
The awarded contractor will be required to conduct a final fit measurement prior to the ordering of any materials.
Site Visits: A site visit is not required, but will be accommodated if needed prior to submitting a bid to ensure the vendor has the door measurements. To schedule a site visit contractors must contact Kyle Williams at kyle.williams@iowadot.us with a date and time of when you want to conduct a site visit. Contractors will be required to bring their own equipment needed for the site visit.
Davis-Bacon wages do not apply. |
Name | Kyle Williams |
Address |
800 Lincoln Way
Ames, IA 50010 |
Phone | (515) 233-7960 |
Fax | |
kyle.williams@iowadot.us |
Supplier Name | Award Line Count | Award Amount | |||
|
|||||
Jensen Builders Ltd | 2 | $35,130.00 |
File Name | Description | File Size | ||||
|
||||||
Bid Tab #170.pdf | Preliminary Bid Tabulation | 433 KB |
Document name | Format | ||||
|
|||||
Bid Invitation | Acrobat / PDF |
File Name | Description | File Size | ||||
|
||||||
standardterms_informal 1_18_22.pdf (please login to view this document) | Standard Bid Terms and Conditions - Informal | 186 KB | ||||
RFB FY2024 #170 Scope & Specs.pdf | Scope, specifications, and relevant documents. | 579 KB | ||||
Pre-Bid Approval of Specs #170.pdf | Pre-bid Approval of Specs | 345 KB |
Activity Date | Activity Name | Description | ||||
|
||||||
9/5/2023 10:00:00 PM (CT) | Pre-bid Request for Approval of Products or Materials | Please have all Pre-bid Request for Approval of Products of Materials submitted no later than 9/5/23 at 10:00PM. |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.