Storm Lake Maintenance Garage Roof Replacement
Agency: | State of Iowa - Department of Transportation |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD18080776831820299 |
Posted Date: | Feb 17, 2023 |
Due Date: | |
Solicitation No: | RFB FY2023 #068 Addendum 2 |
Bid Information
Type | Request for Bid - Formal - Construction |
Status | Awarded |
Number | RFB FY2023 #068 Addendum 2 (Storm Lake Maintenance Garage Roof Replacement) |
Issue Date & Time | 1/19/2023 12:52:37 PM (CT) |
Close Date & Time | 2/13/2023 01:00:00 PM (CT) |
Duration | 25 days 7 minutes 22 seconds |
Notes |
We highly recommend online submission of responses.
This expedites the process and reduces errors for both buyer and supplier.
Over view:
The project consists of removing existing roof membrane, ballast, and insulation and replacing with new ballasted EPDM membrane with insulation and vapor barrier per drawings and specifications.
Contractor to be a licensed roofer in the state of Iowa.
DOT Estimated Start Date: To be coordinated with project manager once notice to proceed email has been issued.
Estimated Completion date:
September 22
, 2023
Davis-Bacon wages do not apply.
Pre-bid:
January 30, 2023 @ 9:00 AM CST.
Pre-bids are recommended.
To attend the pre-bid meeting please use the below link:
Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting
Meeting ID:
283 337 045 49
Download Teams | Join on the web Or call in (audio only) +1 515-817-6093,,295088770# United States, Iowa City Phone Conference ID: 295 088 770# Find a local number | Reset PIN
Award: It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.
Questions: All questions related to this project are to be submitted through the IONwave Bid system through the cut off period for question submissions.
Bid Opening:
Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting
Meeting ID:
260 106 359 418
Download Teams | Join on the web Or call in (audio only) +1 515-817-6093,,262553517# United States, Iowa City Phone Conference ID: 262 553 517# Find a local number | Reset PIN
Those who join the public bid opening after 1pm may not hear all the responses read aloud but all responses will be posted publicly for viewing as soon as they become available.
|
Name | Jody McNaughton |
Address |
800 Lincoln Way
Ames, IA 50010 |
Phone | 1 (515) 239-1298 |
Fax | |
jody.mcnaughton@iowadot.us |
Supplier Name | Award Line Count | Award Amount |
Moss Roofing & Insulation, Inc. | 1 | $129,400.00 |
File Name | Description | File Size |
bid tabulation.pdf | Bid tabulation | 74 KB |
Document name | Format |
Award Detail Spreadsheet | Excel 2007 / XLS |
Bid Tabulation by Line Item Spreadsheet | Excel 2007 / XLS |
Bid Invitation | Acrobat / PDF |
Public Question & Answer | Acrobat / PDF |
File Name | Description | File Size |
standardterms_formal 1_18_22.pdf (please login to view this document) | Standard Bid Terms and Conditions - Formal | 207 KB |
Storm Lake Maintenance Garage Roof Repl -Manual.pdf | Storm Lake Maintenance Garage Roof Replacement - Manual | 252 KB |
Storm Lake Maintenance Garage Roof Repl -Plan.pdf | Storm Lake Maintenance Garage Roof Replacement - Plan | 350 KB |
Prebid Request for Approval of Products or Materials .pdf | Prebid Request for Approval of Products or Materials | 197 KB |
Storm Lake Maintenance Garage Roof Replacement Addendum 1.pdf | Storm Lake Maintenance Garage Roof Replacement Addendum 1 | 102 KB |
Addendum 2 Storm Lake RFBY2023#068 _.pdf | addendum 2 | 445 KB |
|
||||||
|
||||||
|
||||||
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.