Iowa Bids > Bid Detail

Electrical Upgrade at the Malcom Maintenance Facility

Agency: State of Iowa - Department of Transportation
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD18080673593462395
Posted Date: Aug 31, 2023
Due Date:
Solicitation No: RFB FY2023 #098 Addendum 3

Bid Information

Type Request for Bid - Formal - Construction
Status Awarded
Number RFB FY2023 #098 Addendum 3 (Electrical Upgrade at the Malcom Maintenance Facility)
Issue Date & Time 8/1/2023 01:00:02 PM (CT)
Close Date & Time 8/30/2023 01:00:00 PM (CT)
Duration 28 days 23 hours 59 minutes 57 seconds
Notes
We highly recommend online submission of responses. This expedites the process and reduces errors for both buyer and supplier.
Contract Award: It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.
Overview: The Iowa DOT is seeking competitive bids for an Iowa licensed electrical contractor to p rovide all materials, labor and equipment necessary for removal and replacement of the existing electrical system at the IDOT Malcom Maintenance Facility as per plans/specifications attached in this solicitation. Project includes removal and replacement of existing electrical power panels, ATS, generator system and wiring as well as removal and disposal of existing items off site and keeping the existing in operation until changeover.
Training: Contractor will provide training and demonstration for exercising equipment and maintenance (see Attribute #13).
Estimated Project Start Date: September 20, 2023 (Start Date shall be coordinated with the IDOT Project Manager)
Estimated Project Completion Date: June 30, 2024 or as determined by the Construction Manager at the pre-construction meeting. (Contractor to indicate any material lead time issues that may prevent them from meeting this timeline and provide guidance for recommended completion date based on material lead time. See Attribute #16).
DOT is seeking an Iowa licensed electrician for completion of this project.
This is project is exempt from state sales tax.
Questions: Until the contract is awarded the sole point of contact for this project is Teri Schulz @ teri.schulz@iowadot.us (see bid contact information). Any questions related to this project are to be submitted to Teri Schulz in writing preferable through the IONwave Bid system. (See the cut off period for question submissions)
Site Visit: In the event a contractor wishes to set up a site visit please contact Teri Schulz via email at teri.schulz @iowadot.us. with a date and time of when you want a site visit. Contractors will be required to bring their own equipment needed for the site visit.
Site visits will be scheduled in advance between August 1-18, 2 023 , between Monday - Thursday, the hours of 7:30 a.m. and 3:00 p.m. Fridays hours are 7:00 a.m to 10:00 a.m.
Recommended Pre-bid Meeting is set up for Contractors to join in via the Microsoft teams link or you can call the phone number and enter the conference ID followed by the # sign to join. We plan to discuss the project and address any questions you have on the project manual and plans.
Pre-Bid Meeting:
Date: August 21, 2023
Time: 9:30 AM CST

Join on your computer or mobile app

Click here to join the meeting

Meeting ID: 249 355 220 391
Passcode: ZDaXAr

Download Teams | Join on the web

Or call in (audio only)

+1 515-817-6093,,364010841# United States, Iowa City

Phone Conference ID: 364 010 841#

Find a local number | Reset PIN

Learn More | Meeting options

Bid Opening : The Iowa DOT will hold the bid opening via Microsoft teams. Participants may join via the link or by calling into the phone number and entering the conference ID number followed by the # sign.
Join on your computer or mobile app
Date: August 30, 2023
Time: 1:00 PM CST

Click here to join the meeting

Meeting ID: 252 558 831 175

Passcode: 4Upt4Q

Download Teams | Join on the web

Or call in (audio only)

+1 515-817-6093,,444496350# United States, Iowa City

Phone Conference ID: 444 496 350#

Find a local number | Reset PIN

Learn More | Meeting options

Those who join the public bid opening after 1 pm may not hear all the responses read aloud but all responses will be posted publicly for viewing as soon as they become available.

Contact Information
Name Teri Schulz
Address 800 Lincoln Way
Ames, IA 50010 USA
Phone (515) 239-1431
Fax
Email Teri.Schulz@iowadot.us
Awarded Suppliers
Supplier Name Award Line Count Award Amount
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
1 items in 1 pages
DM Metro Electric 1 $208,021.00
Award Attachments
File Name Description File Size
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
1 items in 1 pages
RFB FY23 #098 Bid Tab final.pdf Bid Tabulation for RFB FY2023 #098 Addendum 3 (Electrical Upgrade at the Malcom Maintenance Facility) 82 KB
Bid Documents
Document name Format
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
2 items in 1 pages
Award Detail Spreadsheet Excel 2007 / XLS
Bid Invitation Acrobat / PDF
Bid Attachments
File Name Description File Size
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
7 items in 1 pages
standardterms_formal 06_25_20.pdf Standard Bid Terms and Conditions 200 KB
Drawings- Malcolm Electrical Upgrade WO28 - IDOT - 01-13-2023.pdf Plans 2.22 MB
Malcom Electrical Specs.pdf Specifications 1.22 MB
RFB 23 #098 Malcom Request for Pre-bid substitution for Products and Materials.pdf Pre-Bid Request for Substitution of Products or Materials 135 KB
Addendum 1 (extend question cutoff date).pdf Addendum 1 76 KB
Addendum 2 (extend response date on Pre-Bid Sub Req form).pdf Addendum 2 209 KB
Addendum 3 ad Approved MFC to spec sheet FINAL.pdf Addendum 3 add MFC to spec sheet 626 KB
Bid Event Non-Participation Activity
Activity Date Activity Name Description
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50
1 items in 1 pages
9/1/2022 09:00:00 PM (CT) Pre-bid Substitution Request Pre-bid Substitution request
Plan Holders
Supplier Name City State Contact Name Email Phone
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50
5 items in 1 pages
ConstructConnect Cincinnati OH Morgan Stinson content@constructconnect.com (800) 364-2059
Interstate PowerSystems omaha NE (402) 709-4972
JKC Consultants Cedar Rapids IA Jeff Christensen jeff.christensen@hmcragg.com (319) 440-5953
Lincoln Builders Bureau Lincoln NE (402) 421-8332
Van Maanen Electric, Inc. Newton IA Josh Hetzler jhetzler@vanmaanenelectric.com (641) 780-6154

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >