Iowa Bids > Bid Detail

Furnish & install Hydronic Heating System Modifications for LeMars Maintenance Facility

Agency: State of Iowa - Department of Transportation
Level of Government: State & Local
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD18080576228548043
Posted Date: Apr 27, 2023
Due Date:
Solicitation No: RFB FY2023 #080

Bid Information

Type Request for Bid - Formal - Construction
Status Awarded
Number RFB FY2023 #080 (Furnish & install Hydronic Heating System Modifications for LeMars Maintenance Facility)
Issue Date & Time 3/23/2023 10:00:04 AM (CT)
Close Date & Time 4/13/2023 01:00:00 PM (CT)
Duration 21 days 2 hours 59 minutes 55 seconds
Notes
Overview:
The current hydronic heating system boiler room equipment, controls, piping, etc. needs replaced. The fluid in the system has only water and not glycol allowing the in-floor piping to freeze at the perimeter piping further reducing the heating needs within the building. The entire system needs flushed / cleaned to eliminate build-up in the system further reducing the efficiency. Also the existing 3 boilers are original to the building and have exceeded their life by several years. The exhaust vent and air intake piping are not installed correctly, and allows the exhaust to be sucked back in to the combustion air piping.

The existing system's piping will be flushed / cleaned, the boiler room piping will be reinstalled to meet the manufacturers requirements. All pumps will be replaced to allow glycol to be used in the system. Glycol will be installed along with a system feeder to provide protection from the future freezing. The boilers / controls will be replaced with 2 higher capacity, more energy efficient units. The exterior exhaust vent and air intake piping will be extended to meet the exhaust and mechanical code requirements.
We are seeking a Iowa Licensed Plumbing / Mechanical Contractor
DOT estimated start date to begin to May 8, 2023
Substantial completion date August 4, 2023
DOT Contract end date is August 18, 2023 this shall include all punch list items are completed, any inspections are completed and final has indicated final acceptance.
Materials are required 15 days after the NOTICE to proceed issued and submittals are reviewed and approved.
It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.
Warranty is required for parts and labor as per attribute.
Pre-bid meeting will be held virtually and it is highly recommended. Site visit is not required but DOT will schedule one upon request. To schedule a site visit please email the purchasing contact listed under the bid contact information with a date and time you would like to visit the site.
To join on your computer, mobile app or room device
Date: March 31, 2023
Time: 1:00 p.m.

Join on your computer, mobile app or room device

Meeting ID: 297 531 984 175
Passcode: XUNtHv

Download Teams | Join on the web

Or call in (audio only)

+1 515-817-6093,,469169796# United States, Iowa City

Phone Conference ID: 469 169 796#

Iowa DOT Bid Opening - To join the virtual is meeting, click the link below or you can join by phone and entering the conference id number followed by the # sign.
Date: April 13,2023
Time: 1:00 p.m.
Microsoft Teams meeting
Click here to join the meeting

Join on your computer or mobile app

Or call in (audio only)

+1 515-817-6093, United States, Iowa City

Phone Conference ID: 757 823 640#

Contact Information
Name Jody McNaughton
Address 800 Lincoln Way
Ames, IA 50010
Phone 1 (515) 239-1298
Fax
Email jody.mcnaughton@iowadot.us
Awarded Suppliers
Supplier Name Award Line Count Award Amount
Fred's Plumbing and Heating 1 $77,900.00
Award Attachments
Bid Documents
Document name Format
Bid Tabulation by Line Item Spreadsheet Excel 2007 / XLS
Bid Invitation Acrobat / PDF
Public Question & Answer Acrobat / PDF
Bid Attachments
File Name Description File Size
Standard Terms_formal.pdf standard terms and conditions 207 KB
Project Manual.pdf Project Manual 795 KB
Plans D3 Le Mars-Boiler Replcmt_11x17_.pdf Plan 6.19 MB
Bid Questions
Question You want to eliminate the continuous loop correct?
Answer Yes, the existing continuous loop in the Boiler Room will be eliminated as indicated on the drawings.
Submitted 4/3/2023 11:47:51 PM (CT)
Question How are we tying into the system will we be “T” ing into it?
Answer

Refer to drawings, sheets:


M-010 Boiler Room - Floor Plan- Modifications, and


M-011 Multi-Boiler Piping [Fig 27b-Ashton, 16b-Le Mars], Roof Vent Fix & Renovation Notes.

Submitted 4/3/2023 11:47:26 PM (CT)
Question

Can we switch over to Navy Boilers?

Answer Provide what is shown and specified in the Documents.
Submitted 4/3/2023 11:47:07 PM (CT)
Plan Holders
Supplier Name City State Contact Name Email Phone
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50
1 items in 1 pages
Fred's Plumbing and Heating Hospers IA (712) 752-8525

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >