Iowa Bids > Bid Detail

CBC Steam Sterilizer

Agency: Iowa State University
Level of Government: State & Local
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
Opps ID: NBD18079494805131574
Posted Date: Dec 12, 2023
Due Date:
Solicitation No: RFQ-1000840

Bid Information

Type Request for Quote (Public)
Status Awarded
Number RFQ-1000840 (CBC Steam Sterilizer)
Issue Date & Time 9/22/2023 04:00:02 PM (CT)
Close Date & Time 10/6/2023 04:00:00 PM (CT)
Duration 13 days 23 hours 59 minutes 57 seconds
Notes
Iowa State University of Science and Technology (ISU) is soliciting information from qualified contractors to provide one new 20 X 20 X 38 chamber size general purpose steam sterilizer on behalf of the Crop Bioengineering Center.
Vendors should read all materials carefully and note the due date.
All questions must be submitted by using the "QUESTIONS" tab related to this bid opportunity.
All bid responses must be submitted through ISUBid.
Contact Information
Name Craig Sondgeroth Procurement Agent
Address 1340 Administrative Services Building
2221 Wanda Daley Drive
Ames, IA 50011-1004 USA
Phone 1 (515) 2949918
Fax 1 (515) 2949606 xCSONDGEROT
Email csond1@iastate.edu
Awarded Suppliers
Supplier Name Award Line Count Award Amount
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
1 items in 1 pages
Consolidated Sterilizer Systems 2 $58,087.90
Bid Documents
Document name Format
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
2 items in 1 pages
Bid Invitation Acrobat / PDF
Public Question & Answer Acrobat / PDF
Bid Attachments
File Name Description File Size
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
4 items in 1 pages
ISU Instructions.pdf Review the instructions for important information. REVISED APRIL 2022 174 KB
ISU General Terms & Conditions.pdf Review the general terms and conditions carefully and any exceptions should be listed in the "Attributes" section. REVISED APRIL 2022 232 KB
Insurance Language - Equipment Repair, Install, Maintenance (low risk) 09-2020.pdf Insurance Requirements - Equipment Repair, Install, Maintenance (low risk) 09-2020 28 KB
IMG_8437.jpg Trade-In Unit 3.18 MB
Bid Questions
Question Can you please re-verify that you really have clean steam. Meaning that you have de-ionized RO clean steam?
Most Universities have house steam, but not clean steam.

I ask becasue it adds ALOT of money. because i will need to add SS piping and also add a SS steam to steam boiler
Thanks
Answer
We have house steam generated from RO water generated at our power plant.
Submitted 10/3/2023 08:43:48 AM (CT)
Question

  1. If we provide a power vertical sliding door unit, will we still be considered (spec says hinged Door(s))?

Answer Hinged door is preferred, but a sliding door unit would be considered.
Submitted 9/28/2023 04:46:40 PM (CT)
Question It references house steam, is it clean steam or RO water we are working with or no?
Answer Clean steam.
Submitted 9/25/2023 02:35:00 PM (CT)
Question Is there a deadline date for delivery/installation or a general timeline we need to be aware of?
Answer Please give your best delivery/install date.
Submitted 9/25/2023 02:34:46 PM (CT)
Question 4) Are there any building restrictions that would limit the transport of the unit or would require knockdown delivery? Being a hinged door, the width is over 38” before being crated for shipping.
Answer No building restrictions.
Submitted 9/25/2023 02:34:14 PM (CT)
Question 3) Is this recessed into a wall or does it need paneling to be cabinet enclosed?
Answer Will be taking the place of existing unit. No cabinetry required. See attached picture.
Submitted 9/25/2023 02:33:59 PM (CT)
Question 2) Do the unit need a trolley? 1 or 2 if pass-through or just the loading carriage?
Answer Single door unit requested.
Submitted 9/25/2023 02:33:47 PM (CT)
Question 1) Single door or pass-through? Spec doesn’t mention but on page 4, section 7 it refers to “doors.”
Answer Single door unit requested.
Submitted 9/25/2023 02:33:13 PM (CT)
Question Is this specification absolutely required? "Compliance with ISO 9001:2008, ISO 13485:2003, CMDCAS and GMP Standards." This requirement is typically not needed in laboratory applications, as GMP or cGMP is shorthand for a piece of equipment that adheres to all United States FDA requirements for pharmaceutical drug production.
Answer
CMDCAS/GMP Standards are not required. Please ensure your offering conforms to the following standards:


• ASME Code, Section VIII, Division 1 for unfired pressure vessels. The pressure vessel is so stamped; ASME Form U-1 is furnished. Shell and door are constructed to withstand working pressure of 45 psig (310.2kPa)

• ASME Code, Section I, Part PMB for power boilers, if optional steam generator is supplied.

• UL/ICE/CSA61010-1 SAFETY REQUIREMENTS FOR ELECTRICALEQUIPMENT FOR MEASUREMENT, CONTROL, AND LABORATORY USE

• UL/ICE/CSA61010-2-040 SAFETY REQUIREMENTS FOR ELECTRICALEQUIPMENT FOR MEASUREMENT, CONTROL AND LABORATORY USEPART 2-040: PARTICULAR REQUIREMENTS FOR STERILIZERS ANDWASHER-DISINFECTORS USED TO TREAT MEDICAL MATERIALS

• UL 508A Standard for Industrial Control Panels
Submitted 9/25/2023 01:13:06 PM (CT)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >