Iowa Bids > Bid Detail

Replace Water Chiller in Reiman Gardens Conservatory

Agency: Iowa State University
Level of Government: State & Local
Category:
  • 41 - Refrigeration, Air Conditioning and Air Circulating Equip.
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD18079011319675213
Posted Date: Aug 2, 2023
Due Date:
Solicitation No: RFQ-1000806 Addendum 1

Bid Information

Type Request for Proposal (Public)
Status Awarded
Number RFQ-1000806 Addendum 1 (Replace Water Chiller in Reiman Gardens Conservatory)
Issue Date & Time 6/26/2023 11:15:01 AM (CT)
Close Date & Time 7/13/2023 03:00:00 PM (CT)
Duration 17 days 3 hours 44 minutes 58 seconds
Notes
Iowa State University of Science and Technology (ISU) is soliciting information from qualified companies to provide & install new water chiller at Reiman Gardens Conservatory.
There will be a Mandatory Pre-bid/Site visit meeting for this bid, see Bid Activities Tab

Companies should read all materials carefully and note the due date.

Companies must direct all questions in reference to this RFQ to the University Representative using the QUESTIONS tab in the ISUbid system.
All Bids will be submitted through the ISUbid system.

Contact Information
Name Wendy Foster
Address 1340 Administrative Services Building
2221 Wanda Daley Drive
Ames, IA 50011-1004 USA
Phone (515) 294-8806
Fax
Email wkfoster@iastate.edu
Awarded Suppliers
Supplier Name Award Line Count Award Amount
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
1 items in 1 pages
Excel Mechanical Company Inc 3
Bid Documents
Document name Format
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
2 items in 1 pages
Bid Invitation Acrobat / PDF
Public Question & Answer Acrobat / PDF
Bid Attachments
File Name Description File Size
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
8 items in 1 pages
ISU Instructions.pdf Review the instructions for important information. REVISED APRIL 2022 174 KB
ISU General Terms & Conditions.pdf Review the general terms and conditions carefully and any exceptions should be listed in the "Attributes" section. REVISED APRIL 2022 232 KB
ISU Construction Terms & Conditions.pdf Review the construction terms and conditions carefully and any exceptions should be listed in the "Attributes" section. 133 KB
Supplemental Construction Terms and Conditions.pdf Supplemental Construction Terms and Conditions 229 KB
RFQ-1000806 Payment & Performance bond.pdf Performance & Payment bond will be completed by the awarded Contractor before the work begins 98 KB
RFQ-1000806 Attachment A-Reiman Gardens-Conservatory Chiller-Replacement (Technical Specs).pdf Attachment A- Reiman Gardens Conservatory chiller replacement- Technical specifications 1.88 MB
Insurance Language - Equipment Repair, Install, Maintenance (high risk) 09-2020.pdf Insurance Requirements - Equipment Repair, Install, Maintenance (high risk) 09-2020 28 KB
RFQ-1000806 Attachment B-Reiman Conservatory Chiller Replacement Drawing(REV1).pdf REVISED DRAWING- Attachment B- Reiman Conservatory chiller replacement- REV1 501 KB
Bid Questions
Question
These are the questions/answers form the Mandatory Pre-bid meeting held July 6, 2 023. A revised drawing (REV1) has been provided (see attachment tab)


Q1- Will ISU/owner hire Johnson Controls for the control work, or will Contractor be responsible for hiring Johnson Controls?

Q2 - Will balancing of the unit be completed by ISU/owner or will Contractor be responsible for balancing?

Q3 - What is the maximum outside temperature for working on this unit?

Q4 - What type of glycol is currently in the unit?

Q5 - A heavy-duty crane will be needed to lift/set this unit. Does the bid address what happens if black top road is damaged during the replacement of the chiller?
Answer
A1 - Controls by owner- spec 23 64 23 3.01.H

A2 - ISU will provide balancing (if needed)

A3- Maximun temperature is 45 degrees.

A4- Dowfrost is currently in the unit. Any reference to "Ethylene Glycol" in the technical specifications/drawings should be replaced with Propylene Glycol.

A5 - Any damage to pavement, landscape, and building structure will be repaired to pre-construction/like new condition.

Submitted 7/7/2023 10:53:42 AM (CT)
Bid Event Participation Activity
Activity Date Activity Name Description
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50
1 items in 1 pages
7/6/2023 11:00:00 AM (CT) MANDATORY Pre-bid/Walk through meeting,
MANDATORY Pre-bid Meeting/Walk through
*
There will be an MANDATORY pre-bid meeting due to the nature of this RFP/RFQ. Hold all questions about the bid until the pre-bid meeting/walkthrough .
Attendance at the Pre-bid meeting (site visit) is required. Failure to attend or have representation at this meeting will result in the Contractor being ineligible to participate in the bid process
*
Pre-bid Meeting starting location; Reiman Gardens Conservatory , 1407 University Blvd., Ames, IA- (check in at the front desk for room info).
Parking for the pre-bid is available lot S1- on the North side of the Reiman Garden Conservatory (just in front of the Maintenance Building).
Please email wkfoster@iastate.edu with your intent to attend this mandatory pre-bid meeting/site visit.
No verbal statements by ISU or its representatives at this meeting will be binding. ISU will post all changes and material clarifications in the form of an addenda after the meeting.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >