Flood Mitigation - River Drive from Carey Ave. to East 3rd St.

Agency: Davenport
Level of Government: State & Local
Category:
  • 99 - Miscellaneous
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD18076077459327737
Posted Date: Dec 14, 2023
Due Date:
Solicitation No: 24-42 Addendum 2

Bid Information

Type Invitation to Bid
Status Awarded
Number 24-42 Addendum 2 (Flood Mitigation - River Drive from Carey Ave. to East 3rd St.)
Issue Date & Time 10/31/2023 11:38:44 AM (CT)
Close Date & Time 11/21/2023 10:00:00 AM (CT)
Duration 20 days 22 hours 21 minutes 15 seconds
Notes
The City of Davenport is seeking bids from qualified vendors for the River Drive flood mitigation project from Carey Avenue to East 3rd Street. The work includes furnishing of all labor, materials, equipment, and services necessary for installation of storm sewer and gatewell structures, including but not limited to trenched and trenchless storm sewer installation, HMA and PCC pavement restoration, and seeding.
Bids must be submitted through the City of Davenport e-bidding system (https://davenport.ionwave.net); no emails, faxes, paper copies or any other submission method will be accepted. Each tab of the Invitation to Bid must be reviewed and responded to accordingly.
Contact Information
Name Kari Thoren
Address 226 WEST FOURTH STREET
DAVENPORT, IA 52801 USA
Phone (563) 888-2267
Fax
Email kari.thoren@davenportiowa.com
Award Attachments
File Name Description File Size
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
1 items in 1 pages
Bid Tabulation.pdf This tabulation is for informational purposes only. It is not a guarantee of an award. All vendors will be notified when an award decision has been made. 131 KB
Bid Documents
Document name Format
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
2 items in 1 pages
Bid Invitation Acrobat / PDF
Public Question & Answer Acrobat / PDF
Bid Attachments
File Name Description File Size
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 15
  • 20
  • 50
16 items in 2 pages
Advertisement for Bids - Flood Mitigation.pdf Advertisement for Bids 133 KB
Final20-20Mitigation20River20Carey.pdf Plans 12.11 MB
Federal Contract Provisions.pdf Federal Contract Provisions 39 KB
Guide to Getting a Unique Entity ID.pdf Unique Entity ID (UEI) Guide 850 KB
Debarment Certification.pdf Debarment and Suspension Certification 40 KB
Lobbying Certification.pdf Certification Regarding Lobbying 9 KB
Insurance Requirements - Medium Hazard.pdf Contractor Insurance Requirements - Medium Hazard 497 KB
SUDAS Top Five.pdf SUDAS | 2023 Required Improvements 228 KB
Instruction to Bidders.pdf Instruction to Bidders 79 KB
Affirmative Action Form.pdf Affirmative Action Program 37 KB
Bidder Status Form - To be completed by all bidders..pdf Bidders Status Form must be filled out and attached under the "Response Attachments" tab. 155 KB
DBE Subcontract contact forms 10.30.2020.doc DBE Subcontract Contact Form 59 KB
General_Contract_Conditions_12.14.20.pdf General Contract Conditions. 12.14.20 262 KB
Addendum 1.pdf Addendum 1 | Summary 76 KB
Final Specs - Flood Mitigation - River and Carey Add1.pdf Addendum 1 | Updated Specifications 8.68 MB
Bid Questions
Question Is this a Davis Bacon wage project?
Answer No, Davis Bacon/Prevailing Wages are not required for this project.
Submitted 11/20/2023 11:53:28 AM (CT)
Question Regarding the Gatewell Structure - The specification indicated to review the plan sheet, notes, and legend for type and size of stone to use. The name of the stone indicated in bid tabulation states “Iowa Buff Wall Stone. This is a sawn cut top and bottom wall stone. The dimensions are ranged in the bid tabulation. This type of wall stone can be cut to an indicated height between the range specified. The rendering concept image depicts more of an “limestone outcropping boulder” appearance. For valued engineering, the limestone outcropping boulder wall would have the same support and retaining capabilities but would have a decreased cost. Could you verify with City what product type they are wanting.
Answer Bids should be based on the specified materials. Note E under Item 95 on Sheet G022 allows the contractor to propose changes to the specified stone but such changes will only be considered after the contract has been awarded and must be approved by the City prior to installation.
Submitted 11/16/2023 08:26:26 AM (CT)
Question I could not find where Railroad Flaggers or Railroad Protective Insurance is required. Are those items incidental to other pay items, or are they not necessary on this project?
Answer Addendum 2 issued to address this.
Submitted 11/16/2023 08:26:04 AM (CT)
Question Special Provisions list three Technical Specifications on page SC-9. 31 0000, 33 0523.16 and 35 2106.29. Where can we find those Technical Specifications?
Answer Pages are included in addendum 1 specification revision.
Submitted 11/6/2023 03:28:02 PM (CT)
Question Is the form liner for Structures SD-101 and SD-216 specified somewhere? Is there any color additive required for the textured concrete?
Answer Plan sheet S000 under submittal includes information regarding the requirement for the Concrete Formliner.
Submitted 11/1/2023 08:17:02 AM (CT)
Question Refer to Drawing S100 and Sections 3, 4, and 5. These sections do not show the exposed portion of the walls as textured. Should these sections, as it relates to textured concrete, be similar to the sections shown for SD-216 on Drawing S101?
Answer This structure is located behind the block wall and the lack of form liner is intentional.
Submitted 11/1/2023 08:14:49 AM (CT)
Question Are the Technical Specifications list on Page SC-9 of the specifications going to be provided?
Answer Pages are included in addendum 1 specification revision.
Submitted 11/1/2023 08:09:23 AM (CT)
Bid Event Participation Activity
Activity Date Activity Name Description
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50
1 items in 1 pages
11/7/2023 02:00:00 PM (CT) Questions Due Questions are due to the Purchasing Division no later than the time indicated. Submit your questions via to questions tab.
Bid Event Non-Participation Activity
Activity Date Activity Name Description
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50
1 items in 1 pages
11/10/2023 10:00:00 AM (CT) Answers Posted Answers to inquiries that were submitted will be issued no later than the date indicated.
Plan Holders
Supplier Name City State Contact Name Email Phone
Data pager
Data pager
Page size:
PageSizeComboBox
select
Your browser does not support inline frames or is currently configured not to display inline frames.
  • 10
  • 20
  • 50
63 items in 4 pages
Americore LLC Blue grass IA Corey Smith Americorellc@gmail.com (641) 455-1714
Bi-State Barricade Rental and Sales Coal Valley IL Tamara A Houseman tamara_houseman@sbcglobal.net (309) 792-1980
Bolton & Menk, Inc Cedar Rapids IA (515) 259-9190
Boomerang Corp. Anamosa IA Estimator contracts@boomerangcorp.com (319) 462-4435
Brandt Construction Co Milan IL Terence L. Brandt tbrandt@brandtconstructionco.com (309) 787-4644
Brierley Associates Corporation Denver CO Steven Vinci svinci@brierleyassociates.com (303) 703-1405
BWC Excavating LC Solon IA Brandon Hansen b.hansen@bwc-co.com (319) 848-7513
CDMI Concrete Contractors Inc. Port Byron IL Chuck McClaine chuck@cdmiconcrete.com (309) 791-2265
Centennial Contractors of the Quad Cities Moline IL Jayme Massa jayme@cciqc.com (309) 736-1212
Central Excavating Inc Bettendorf IA Brian Gilbank brian@centralexc.com (608) 728-3692
Century Fence Company Pewaukee WI Jon Winslow jwinslow@centuryfence.com (262) 547-3331
CIT Sewer Solutions mc callsburg IA Shane Jacobson shane@citsewer.com (515) 290-8295
Civil Constructors Inc. East Moline IL Eric Loomis eloomis@helmgroup.com (309) 755-5535
Construction Update Plan Room Des Moines IA Cindy Adams CAdams@mbi.build (515) 288-7339
Davenport Electric Contract Company Davenport IA Barry Van Blaricom barry@davenportelectric.com (563) 326-6475
Emery Construction Group Inc. Moline IL Blake Lanum blake@emeryconstgroup.com (309) 797-2070
Engineered Equipment Solutions, Inc. State Center IA Jim Streeter jim@e-equipmentsolutions.com (641) 483-2904
Engineering & Construction Innovations, Inc. Oakdale MN Donita Bowden dbowden@eciconstructors.com (719) 250-4324
EnviroNET, Inc. Davenport IA Molly Arp Newell molly@environetmidwest.com (563) 323-2262
Five Cities Construction Company coal valley IL Bryan Bealer fivecitiesconstruction@hotmail.com (309) 781-7879

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >