Provide Spray Polyurethane Insulation (ccSPF) in cavities at existing roof bar
joist extensions to seal air penetrations, located on 2nd Floor Level. Note: the existing space
is an open ceiling design, so no conflict exist from a ceiling;
Work shall be as indicated on drawings.
The project period to begin is July 1st, 2023.
Anticipated work end date: no later than Aug. 10st, 2023
Anticipated Final Acceptance: no later than Aug. 24th, 2023
Site Visit:
Site visits are recommended. Interested bidders can schedule a site visit with the Purchasing Agent listed on the solicitation via email @ julie.brown@iowadot.us.
DOT will coordinate with the garage staff and send you confirmation once the site visit has been scheduled.
Contractors will be required to bring their own equipment needed for the site visit.
It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.
This is a tax exempt project.