THE PROJECT CONSISTS OF THE CONSTRUCTION OF A NEW 8339 SQFT, 3000 TON SALT
A. Wood Pole Building consisting of metal panel siding and metal panel roof.
B. New and Existing Precast T's to increase existing storage capacity to 3000T salt storage
C. New asphalt paving and topping of existing asphalt inside of the Precast T's
D. All site work as noted in drawings including: Grading, paving, approaches.
DOT Estimated Start Date: June 5, 2024
Substantial completion date: September 15, 2023
DOT Completion date no later than:
September 30
, 2023
this shall include all punch list items are completed, any inspections are completed and final has indicated final acceptance. Lead time on materials and installation timeframe once materials is received is critical.
Davis-Bacon wages do not apply.
The contractor needs to be certified installer for pole building Manufacturer.
Recommend Pre-Bid:
An optional virtual pre-bid meeting is recommended. To attend the option virtual pre-bid meeting please use the link indicated below.
Date: May 5
Time: 9:00 AM CST.
Click here to join the meeting
Meeting ID:
290 083 334 109
Passcode:
CZwndR
Download Teams | Join on the web
Or call in (audio only)
+1 515-817-6093,,379256970#
United States, Iowa City
Phone Conference ID:
379 256 970#
Find a local number | Reset PIN
Learn More | Meeting options
Join on your computer, mobile app or room device
Public Bid Opening:
A virtual bid opening is being held, To attend the option virtual bid opening please use the below link:
Date: May 25, 2023
Time: 1: 00p.m. cst
Click here to join the meeting
Meeting ID:
278 461 289 345
Passcode:
utWpyc
Download Teams | Join on the web
Or call in (audio only)
+1 515-817-6093,,286100654#
United States, Iowa City
Phone Conference ID:
286 100 654#
Find a local number | Reset PIN
Learn More | Meeting options
Those who join the public bid opening after 1pm may not hear all the responses read aloud but all responses will be posted publicly for viewing as soon as they become available.
Award
: It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.
Questions: All questions related to this project are to be submitted through the IONwave Bid system through the cut off period for question submissions.