Iowa Bids > Bid Detail

Sioux City Substation No. 2 Transformer Replacements

Agency: ENERGY, DEPARTMENT OF
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159992221460483
Posted Date: Dec 13, 2022
Due Date: Jan 22, 2023
Solicitation No: 89503423BWA000037
Source: https://sam.gov/opp/a18a4c97d3...
Follow
Sioux City Substation No. 2 Transformer Replacements
Active
Contract Opportunity
Notice ID
89503423BWA000037
Related Notice
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
WESTERN-UPPER GREAT PLAINS REGION
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • All Dates/Times are: (UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Original Published Date: Dec 13, 2022 09:47 am CST
  • Original Response Date: Jan 22, 2023 02:00 pm CST
  • Inactive Policy: 15 days after response date
  • Original Inactive Date:
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1PZ - CONSTRUCTION OF OTHER NON-BUILDING FACILITIES
  • NAICS Code:
    • 237130 - Power and Communication Line and Related Structures Construction
  • Place of Performance:
    Hinton , IA 51024
    USA
Description

Western Area Power Administration (WAPA) has a requirement for a contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of Sioux City Substation No. 2, Transformer Replacements, Iowa.



The principal components of the work involve sitework; demoliton; providing an oil detention basin; providing concrete foundations; installing Government-Furnished (GFE) equipment including a disconnecting switch, current limiting reactors,and 1/0 AWG 25-kV insulated copper cable; installing GFE steel structures; providing voltage transformers and a resistor; installing GFE control cable; associated electrical equipment and material, and existing outdoor electrical equipment and material.



The estimated construction magnitude of this project is between $500,000 and $1,000,000. All work is to be completed within 210 days from receipt of Notice to Proceed. All responsible small business concerns may submit a bid which shall be considered by this Agency. This solicitation will be issued on or about December 23, 2022, bid close January 22, 2023, and the projected bid opening date is January 23, 2023.



Construction Change Order Definitization Notice



https://www.wapa.gov/DoingBusiness/SmallBusiness/Pages/small-business.aspx




Attachments/Links
Contact Information
Contracting Office Address
  • 2900 4TH AVE. NORTH
  • BILLINGS , MT 59101
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Dec 13, 2022 09:47 am CSTPresolicitation (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >