Saylorville Control Tower Sluice Gate Project
Agency: | DEPT OF DEFENSE |
---|---|
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159648242106635 |
Posted Date: | Jul 27, 2023 |
Due Date: | Aug 25, 2023 |
Solicitation No: | W912EK23B0007 |
Source: | https://sam.gov/opp/56106cbf4a... |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
- Original Published Date: Jul 27, 2023 02:43 pm CDT
- Original Date Offers Due: Aug 25, 2023 10:00 am CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Sep 09, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Z1LB - MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Johnston , IA 50131USA
The work includes but is not limited to replace the main lifting mechanisms of the 4 gates along with fabrication and installation of 4 new gates. Major components to be replaced include wire rope, sheaves, sheave, bushings, sheave shafts and replacing the pillow block bearings. Minor components associated with these items are also replaced as required. The gear reducer is rehabbed by replacing seals, bearings, and gearbox fluid. The wire rope drum is cleaned and reused, and the motor is reused. The Electrical replacement requirements for this project are installation of new permanent LED light fixtures that will illuminate the operating floor EL 880.0 Feet for each service gate slot and each emergency gate slot. The main activities are dogging-off gates and inspecting each gate as is rises through its lower slot, and the removal of existing interior original light fixtures that illuminate EL. 913.0 Feet and to replace them with new LED light fixtures and lastly the removal of existing outdoor control tower light fixtures installed at the roof elevation at the parapet walls. The replace of the railing at the wells will be changed from angled steel to replace with speed rails. There will also be a need for installation of catwalk, to inspect the lifting sleeves in the future.
This action is Unrestricted Invittion for Bid.
See attached Solicitation, Plans, Drawing and Specification for details:
NOTE: Interest parties shall contact contract specialist Stanley L. Bolton at stanley.l.bolton@usaces.army.mil for a copy of the Drawings because the file was to large to post.
- KO CONTRACTING DIVISION 1 ROCK ISLAND ARSENAL
- ROCK ISLAND , IL 61299-5001
- USA
- Stanley L. Bolton
- stanley.l.bolton@usace.army.mil
- Ryan R. Larrison
- Ryan.R.Larrison@usace.army.mil
- Jul 27, 2023 02:43 pm CDTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.