Repair Shop Concrete Replacement - Formal Bid
Agency: | State of Iowa - Department of Transportation |
---|---|
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD18080980056619043 |
Posted Date: | Jan 3, 2023 |
Due Date: | |
Solicitation No: | RFB FY2023 #100 Addendum 5 |
Bid Information
Type | Request for Bid - Informal - Construction |
Status | Awarded |
Number | RFB FY2023 #100 Addendum 5 (Repair Shop Concrete Replacement - Formal Bid) |
Issue Date & Time | 10/7/2022 02:37:04 PM (CT) |
Close Date & Time | 11/22/2022 01:00:00 PM (CT) |
Duration | 1 month 15 days |
Notes |
Formal Bid.
We highly recommend online submission of responses.
This expedites the process and reduces errors for both buyer and supplier.
It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule.
Overview:
Repair Shop Concrete Replacement:
Contractor to remove noted concrete and grassy areas for replacement, and concrete area on west side to be coordinated with separate contract for drain replacement. Concrete approach to overhead doors to be sloped away from building. Existing stoops to remain and portion of the existing sidewalk. Concrete replacement to meet specs provided. Work to be done during regular days and hours Monday - Friday 7:00 AM - 4:30 PM (CST). DOT to employee 3rd party testing agency for concrete and fill testing to be coordinated by contractor when testing needed.
All concrete on West side of Repair Shop to be completed first with North side concrete to follow.
Warranty:
1 year warranty on labor
Estimated start and completion date:
Estimated start date: November 18, 2022 - or upon award once notice to proceed email has been issued.
Estimated completion date: West side concrete - December 1, 2022 & remaining North concrete - June 1, 2023
Site Visit:
A site visit is recommended. Interested bidders can schedule a site visit with the Purchasing Agent listed on the solicitation via email at tiffany.stupp@iowadot.us
Point of Contact:
Until the contract is awarded the sole point of contact for this project is Tiffany Stupp (see bid contact information) any and all questions related to this project are to be submitted to Tiffany Stupp through the IONwave Bid system. (See the cut off period for questions)
This is project is exempt from state sales tax.
Davis-bacon wages do not apply.
Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting
Meeting ID:
293 539 561 298
Download Teams | Join on the web Or call in (audio only) +1 515-817-6093,,720338530# United States, Iowa City Phone Conference ID: 720 338 530# Find a local number | Reset PIN |
Name | Tiffany Stupp |
Address |
800 Lincoln Way
Ames, IA 50010 |
Phone | 1 (515) 239 x1429 |
Fax | |
tiffany.stupp@iowadot.us |
Supplier Name | Award Line Count | Award Amount |
Minturn, Inc. | 1 | $118,800.00 |
File Name | Description | File Size |
Preliminary Bid tab for RFB FY2023 #100 Ad 5.pdf | Preliminary Bid tab for RFB FY2023 #100 Ad 5 | 81 KB |
Final Bid tab for RFB FY2023 #100 Ad 5.pdf | Final bid tab for RFB FY2023 #100 Ad 5 | 81 KB |
Document name | Format |
Award Detail Spreadsheet (please login to view this document) | Excel 2007 / XLS |
Bid Invitation (please login to view this document) | Acrobat / PDF |
File Name | Description | File Size |
standardterms_formal 1_18_22.pdf (please login to view this document) | Standard Bid Terms and Conditions - Formal | 207 KB |
Repair Shop Concrete Plans 9-16-22.pdf | Repair Shop Concrete Plans | 14.12 MB |
Prebid Request for Approval of Products or Materials .pdf | Prebid Request for Approval of Products or Materials | 367 KB |
Repair Shop Concrete Replacement Spec.pdf | Repair Shop Spec | 142 KB |
Repair Shop Concrete Replacement Addendum 1.pdf | Repair Shop Concrete Replacement Addendum 1 | 309 KB |
Repair Shop Concrete Replacement Addendum 2.pdf | Repair Shop Concrete Replacement Addendum 2 | 96 KB |
Repair Shop Concrete Plans Addendum 2.pdf | Repair Shop Concrete Plans Addendum 2 | 192 KB |
Repair Shop Concrete Replacement Addendum 4.pdf | Repair Shop Concrete Replacement Addendum 4 | 59 KB |
Repair Shop Proposed Plan Addendum - Addendum 4 Drawing.pdf | Repair Shop Proposed Plan Addendum - Addendum 4 Drawing | 181 KB |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.