Bid Opening Info: 11:00 AM on Wednesday, November 30, 2022 at 1346 W. Airline Highway, Waterloo, IA 50703
Description: The extent of the work involved in the Structures on Cedar Valley Nature Trail project consists of removal of the existing bridge at STA S 262+77.20, selective removals of an existing box culvert at STA S 370+25, and removal of the existing concrete box culvert at STA S 522+66.77. The new bridge at STA S 262+77.20 will be a 132’x12’ PPCB bridge. New headwalls will be constructed at the STA S 370+25 structure. A new concrete pipe will be constructed at STA S 522+66.77.